Archived data: PSE has not reported this unit since 31 Dec 2025
The units have been taken out of service.
Operating history
The selected period applies to the operating strip and daily energy: 2 Dec – 31 Dec 2025
Operation and stops
In operation on 21 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | DOD 4-08 |
|---|---|
| 31 Dec 2025 | stopped |
| 30 Dec 2025 | stopped |
| 29 Dec 2025 | stopped |
| 28 Dec 2025 | stopped |
| 27 Dec 2025 | stopped |
| 26 Dec 2025 | stopped |
| 25 Dec 2025 | stopped |
| 24 Dec 2025 | 9% |
| 23 Dec 2025 | 54% |
| 22 Dec 2025 | 56% |
| 21 Dec 2025 | 52% |
| 20 Dec 2025 | 53% |
| 19 Dec 2025 | 51% |
| 18 Dec 2025 | 52% |
| 17 Dec 2025 | 55% |
| 16 Dec 2025 | 55% |
| 15 Dec 2025 | 55% |
| 14 Dec 2025 | 52% |
| 13 Dec 2025 | 52% |
| 12 Dec 2025 | 55% |
| 11 Dec 2025 | 54% |
| 10 Dec 2025 | 55% |
| 9 Dec 2025 | 53% |
| 8 Dec 2025 | 55% |
| 7 Dec 2025 | 5% |
| 6 Dec 2025 | stopped |
| 5 Dec 2025 | 48% |
| 4 Dec 2025 | stopped |
| 3 Dec 2025 | 68% |
| 2 Dec 2025 | 59% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Wednesday 31 Dec 2025 · 0 MWh
Day profile
Wednesday 31 Dec 2025, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
55.5%
Outages in total
19 days
| Start | End | Length | Label |
|---|---|---|---|
| 24 Dec 2025 03:30 | at least until 1 Jan 2026 00:00 | at least 7 days | longer outage |
| 6 Dec 2025 00:15 | 7 Dec 2025 20:30 | 1 day | |
| 4 Dec 2025 00:30 | 5 Dec 2025 06:00 | 1 day | |
| 26 Nov 2025 22:00 | 1 Dec 2025 03:30 | 4 days | |
| 21 Nov 2025 20:15 | 23 Nov 2025 13:00 | 1 day | |
| before 19 Nov 2025 00:00 | 21 Nov 2025 04:15 | at least 2 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.