Archived data: PSE has not reported this unit since 31 Dec 2025
The units have been taken out of service.
Hard coal unit

DOD 4-08

plant: Dolna Odra · operator: PGE GiEK

Operating history

The selected period applies to the operating strip and daily energy: 2 Dec – 31 Dec 2025
All

Operation and stops

In operation on 21 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Wednesday 31 Dec 2025 · 0 MWh

Day profile

Wednesday 31 Dec 2025, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
55.5%
Outages in total
19 days
StartEndLengthLabel
24 Dec 2025 03:30at least until 1 Jan 2026 00:00at least 7 dayslonger outage
6 Dec 2025 00:157 Dec 2025 20:301 day
4 Dec 2025 00:305 Dec 2025 06:001 day
26 Nov 2025 22:001 Dec 2025 03:304 days
21 Nov 2025 20:1523 Nov 2025 13:001 day
before 19 Nov 2025 00:0021 Nov 2025 04:15at least 2 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.