Archived data: PSE has not reported this unit since 31 Aug 2026
The units have been taken out of service.
Hard coal power plant

Dolna Odra

Nowe Czarnowo, commune of Gryfino (West Pomeranian Voivodeship) · operator: PGE GiEK

Units

DOD 2-05last data 31 Dec 2025
DOD 4-07last data 31 Aug 2026
DOD 4-08last data 31 Dec 2025
DOD_2-06last data 31 Aug 2026

Operating history

The selected period applies to both charts below: 2 Aug – 31 Aug 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Monday 31 Aug 2026 · 0 MWh

Day profile

Monday 31 Aug 2026, MW; layers are units

About the plant

A coal-fired power plant from the 1970s. Its last units, nos. 5–8 (around 222–232 MW each), have been shut down: 5 and 8 at the end of 2025, 6 and 7 in August 2026. The new Gryfino gas-fired units operate on its site.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.