The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

WSIB1-07

plant: EC Siekierki · operator: PGE Energia Ciepła
Power now
80 MW
Load
27% of 300 MW
Running without a break
41 days, since 8 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 300 MW
now 80 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
63.9%
Outages in total
131 days
StartEndLengthLabel
29 Sep 2026 20:158 Oct 2026 10:008 days
27 Jun 2026 09:307 Sep 2026 11:4572 daysvery long outage
15 Jun 2026 10:0022 Jun 2026 18:157 days
5 Jun 2026 00:3014 Jun 2026 20:159 days
20 May 2026 10:0023 May 2026 20:153 days
5 May 2026 00:458 May 2026 15:153 days
21 Mar 2026 07:1522 Mar 2026 19:451 day
19 Jan 2026 14:1520 Jan 2026 23:451 day
24 Dec 2025 10:3030 Dec 2025 17:006 days
3 Dec 2025 00:456 Dec 2025 03:453 days
24 Nov 2025 18:302 Dec 2025 19:308 days
before 19 Nov 2025 00:0024 Nov 2025 16:00at least 5 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.