The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

WSIB1-08

plant: EC Siekierki · operator: PGE Energia Ciepła
Power now
0 MW
Load
0% of 190 MW
Not running
221 days, since 11 Apr 2026
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 190 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
32.4%
Outages in total
245 days
StartEndLengthLabel
11 Apr 2026 01:00ongoing 221 daysvery long outage
3 Apr 2026 11:008 Apr 2026 03:004 days
24 Mar 2026 04:4530 Mar 2026 00:005 days
11 Mar 2026 00:0016 Mar 2026 16:455 days
27 Feb 2026 00:001 Mar 2026 18:152 days
15 Dec 2025 08:1519 Dec 2025 21:004 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.