plant: EC Siekierki · operator: PGE Energia Ciepła
Power now
80 MW
Load
82% of 90 MW
Running without a break
39 days, since 10 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 90 MW
now 80 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,800 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
63.2%
Outages in total
133 days
StartEndLengthLabel
8 Oct 2026 12:1510 Oct 2026 06:001 day
1 Oct 2026 11:002 Oct 2026 14:001 day
19 Sep 2026 01:1529 Sep 2026 18:1510 days
13 Jun 2026 01:4517 Sep 2026 16:3096 daysvery long outage
24 May 2026 00:004 Jun 2026 19:4511 days
2 May 2026 12:004 May 2026 20:152 days
17 Feb 2026 17:3023 Feb 2026 05:155 days
28 Jan 2026 00:0031 Jan 2026 06:003 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.