The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

WSIB1-09

plant: EC Siekierki · operator: PGE Energia Ciepła
Power now
80 MW
Load
21% of 370 MW
Running without a break
13 days, since 5 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 370 MW
now 80 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 23 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
62.1%
Outages in total
137 days
StartEndLengthLabel
31 Oct 2026 02:455 Nov 2026 04:155 days
24 Oct 2026 00:0025 Oct 2026 21:001 day
11 Oct 2026 09:4512 Oct 2026 20:001 day
23 Sep 2026 16:3025 Sep 2026 04:301 day
15 Sep 2026 23:4521 Sep 2026 14:155 days
7 Sep 2026 23:4514 Sep 2026 21:306 days
23 Aug 2026 22:1527 Aug 2026 02:453 days
10 Aug 2026 13:0011 Aug 2026 20:001 day
1 May 2026 10:308 Aug 2026 04:4598 daysvery long outage
23 Apr 2026 13:3026 Apr 2026 17:453 days
18 Apr 2026 08:4519 Apr 2026 19:001 day
5 Apr 2026 05:008 Apr 2026 05:153 days
5 Feb 2026 20:008 Feb 2026 06:452 days
14 Dec 2025 00:1515 Dec 2025 01:301 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.