Power now
130 MW
Load
60% of 220 MW
Running without a break
11 days, since 6 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 220 MW
now 130 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 26 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | JW3_2S02 |
|---|---|
| 18 Nov 2026 | 62% |
| 17 Nov 2026 | 65% |
| 16 Nov 2026 | 64% |
| 15 Nov 2026 | 60% |
| 14 Nov 2026 | 61% |
| 13 Nov 2026 | 65% |
| 12 Nov 2026 | 63% |
| 11 Nov 2026 | 70% |
| 10 Nov 2026 | 68% |
| 9 Nov 2026 | 72% |
| 8 Nov 2026 | 71% |
| 7 Nov 2026 | 75% |
| 6 Nov 2026 | 24% |
| 5 Nov 2026 | stopped |
| 4 Nov 2026 | stopped |
| 3 Nov 2026 | 70% |
| 2 Nov 2026 | 70% |
| 1 Nov 2026 | 66% |
| 31 Oct 2026 | 69% |
| 30 Oct 2026 | 65% |
| 29 Oct 2026 | 67% |
| 28 Oct 2026 | 69% |
| 27 Oct 2026 | 63% |
| 26 Oct 2026 | 44% |
| 25 Oct 2026 | stopped |
| 24 Oct 2026 | stopped |
| 23 Oct 2026 | 64% |
| 22 Oct 2026 | 61% |
| 21 Oct 2026 | 64% |
| 20 Oct 2026 | 70% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,400 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
34.8%
Outages in total
186 days
| Start | End | Length | Label |
|---|---|---|---|
| 4 Nov 2026 00:00 | 6 Nov 2026 13:45 | 2 days | |
| 24 Oct 2026 00:15 | 26 Oct 2026 06:00 | 2 days | |
| 10 Oct 2026 17:15 | 12 Oct 2026 02:45 | 1 day | |
| 28 Sep 2026 17:45 | 5 Oct 2026 02:15 | 6 days | |
| 5 Sep 2026 22:00 | 9 Sep 2026 13:15 | 3 days | |
| 28 Aug 2026 00:00 | 31 Aug 2026 02:45 | 3 days | |
| 15 Aug 2026 07:00 | 24 Aug 2026 03:00 | 8 days | longer outage |
| 22 Jul 2026 23:30 | 30 Jul 2026 13:30 | 7 days | longer outage |
| 13 Jul 2026 12:45 | 20 Jul 2026 02:45 | 6 days | |
| 6 Jul 2026 22:00 | 13 Jul 2026 03:45 | 6 days | |
| 25 Jun 2026 09:00 | 1 Jul 2026 13:00 | 6 days | |
| 10 Jun 2026 18:45 | 14 Jun 2026 23:15 | 4 days | |
| before 1 Feb 2026 00:00 | 8 Jun 2026 13:45 | at least 127 days | very long outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.