The Watt Mix
PLEN
Archived data: PSE has not reported this unit since 31 Aug 2026
Hard coal unit

RYB 2-05

plant: Rybnik · operator: PGE GiEK

Operating history

The selected period applies to the operating strip and daily energy: 2 Aug – 31 Aug 2026
All

Operation and stops

In operation on 21 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Monday 31 Aug 2026 · 3,800 MWh

Day profile

Monday 31 Aug 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
72.3%
Outages in total
61 days
StartEndLengthLabel
21 Aug 2026 21:1524 Aug 2026 05:002 days
13 Aug 2026 21:1517 Aug 2026 14:003 days
7 Aug 2026 19:009 Aug 2026 14:301 day
4 Aug 2026 19:006 Aug 2026 15:001 day
31 Jul 2026 23:154 Aug 2026 14:303 days
23 Jul 2026 19:4530 Jul 2026 13:156 days
9 Jul 2026 22:1514 Jul 2026 03:304 days
6 Jul 2026 22:008 Jul 2026 14:301 day
4 Jul 2026 00:156 Jul 2026 03:152 days
27 Jun 2026 00:0029 Jun 2026 14:302 days
23 May 2026 22:1525 May 2026 14:301 day
16 May 2026 22:1519 May 2026 04:152 days
8 May 2026 20:3012 May 2026 03:453 days
14 Apr 2026 18:0018 Apr 2026 04:003 days
10 Apr 2026 20:1514 Apr 2026 04:153 days
12 Mar 2026 23:0016 Mar 2026 03:153 days
16 Jan 2026 22:1519 Jan 2026 03:302 days
25 Dec 2025 22:1529 Dec 2025 03:303 days
19 Dec 2025 00:0025 Dec 2025 14:306 days
before 19 Nov 2025 00:0020 Nov 2025 13:15at least 1 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.