The Watt Mix
PLEN
Archived data: PSE has not reported this unit since 30 Oct 2026
Hard coal unit

SNA11S03

plant: Skawina · operator: ResInvest Energy Skawina

Operating history

The selected period applies to the operating strip and daily energy: 1 Oct – 30 Oct 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Friday 30 Oct 2026 · 0 MWh

Day profile

Friday 30 Oct 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
17.6%
Outages in total
285 days
StartEndLengthLabel
28 Sep 2026 08:45at least until 31 Oct 2026 00:00at least 32 dayslong outage
19 Jun 2026 03:4523 Sep 2026 10:4596 daysvery long outage
15 May 2026 15:0020 May 2026 08:154 days
5 Feb 2026 11:0015 May 2026 12:4599 daysvery long outage
before 19 Nov 2025 00:009 Jan 2026 22:30at least 51 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.