The Watt Mix
PLEN
Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

JW3 2-01

plant: Jaworzno 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 22 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 3,100 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
32.0%
Outages in total
50 days
StartEndLengthLabel
17 Jan 2026 21:1519 Jan 2026 04:451 day
14 Jan 2026 14:1517 Jan 2026 00:002 days
10 Jan 2026 00:0011 Jan 2026 23:001 day
30 Dec 2025 23:005 Jan 2026 04:005 days
24 Dec 2025 00:0030 Dec 2025 03:456 days
11 Dec 2025 20:0022 Dec 2025 05:0010 dayslonger outage
before 19 Nov 2025 00:0011 Dec 2025 18:00at least 22 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.