Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

JW3 2-02

plant: Jaworzno 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
18.5%
Outages in total
60 days
StartEndLengthLabel
19 Dec 2025 20:15at least until 1 Feb 2026 00:00at least 43 daysvery long outage
12 Dec 2025 08:4517 Dec 2025 01:154 days
9 Dec 2025 22:0011 Dec 2025 04:301 day
6 Dec 2025 09:008 Dec 2025 06:001 day
3 Dec 2025 11:305 Dec 2025 04:301 day
1 Dec 2025 20:153 Dec 2025 04:001 day
25 Nov 2025 10:151 Dec 2025 05:155 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.