Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

JW3 2-04

plant: Jaworzno 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 9 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
42.9%
Outages in total
40 days
StartEndLengthLabel
30 Jan 2026 21:30at least until 1 Feb 2026 00:00at least 1 day
25 Jan 2026 00:1530 Jan 2026 12:005 days
22 Dec 2025 22:0017 Jan 2026 02:4525 dayslong outage
20 Dec 2025 00:0021 Dec 2025 23:151 day
13 Dec 2025 00:0015 Dec 2025 05:002 days
28 Nov 2025 22:001 Dec 2025 02:152 days
21 Nov 2025 21:1523 Nov 2025 15:301 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.