Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

JW3 2-05

plant: Jaworzno 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 24 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 3,200 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
34.6%
Outages in total
48 days
StartEndLengthLabel
23 Jan 2026 22:3026 Jan 2026 03:002 days
2 Jan 2026 22:007 Jan 2026 02:304 days
31 Dec 2025 22:002 Jan 2026 04:001 day
before 19 Nov 2025 00:0029 Dec 2025 13:00at least 40 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.