Hard coal unit

JW3 2-06

plant: Jaworzno 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 9 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
40.6%
Outages in total
43 days
StartEndLengthLabel
30 Jan 2026 19:15at least until 1 Feb 2026 00:00at least 1 day
16 Jan 2026 06:0030 Jan 2026 09:1514 dayslong outage
9 Jan 2026 17:4512 Jan 2026 06:302 days
29 Dec 2025 22:157 Jan 2026 04:308 dayslonger outage
27 Dec 2025 22:3029 Dec 2025 00:451 day
16 Dec 2025 20:3026 Dec 2025 12:159 dayslonger outage
12 Dec 2025 21:1515 Dec 2025 00:152 days
21 Nov 2025 22:1523 Nov 2025 16:151 day
before 19 Nov 2025 00:0021 Nov 2025 12:15at least 2 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.