Hard coal unit

OPL 1-01

plant: Opole · operator: PGE GiEK
Power now
0 MW
Load
0% of 360 MW
Not running
1 day, since 16 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 360 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 6 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
14.8%
Outages in total
308 days
StartEndLengthLabel
16 Nov 2026 20:00ongoing 1 day
3 Nov 2026 00:0012 Nov 2026 02:009 dayslonger outage
28 Sep 2026 22:002 Nov 2026 03:1534 daysvery long outage
26 Sep 2026 00:3028 Sep 2026 13:302 days
18 Sep 2026 00:1523 Sep 2026 04:005 days
4 Sep 2026 08:307 Sep 2026 03:452 days
27 Aug 2026 12:3031 Aug 2026 15:304 days
11 Aug 2026 09:4524 Aug 2026 15:1513 dayslonger outage
8 Aug 2026 11:1510 Aug 2026 14:452 days
1 Aug 2026 00:156 Aug 2026 14:155 days
23 May 2026 00:1527 Jul 2026 15:1565 daysvery long outage
10 Apr 2026 22:3021 May 2026 21:1540 daysvery long outage
27 Feb 2026 00:0010 Apr 2026 07:0042 daysvery long outage
21 Feb 2026 10:1525 Feb 2026 01:453 days
13 Feb 2026 10:1516 Feb 2026 04:002 days
31 Jan 2026 07:309 Feb 2026 05:458 dayslonger outage
22 Jan 2026 20:1530 Jan 2026 15:007 dayslonger outage
16 Jan 2026 00:1521 Jan 2026 18:455 days
before 19 Nov 2025 00:008 Jan 2026 04:00at least 50 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.