The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

OPL 4-05

plant: Opole · operator: PGE GiEK
Power now
410 MW
Load
49% of 830 MW
Running without a break
19 h, since yesterday 15:30

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 830 MW
now 410 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 25 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 10,500 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
85.2%
Outages in total
52 days
StartEndLengthLabel
11 Nov 2026 00:0016 Nov 2026 14:305 days
22 Sep 2026 23:4529 Sep 2026 02:006 days
23 May 2026 06:4525 May 2026 02:301 day
29 Apr 2026 09:0030 Apr 2026 18:151 day
25 Apr 2026 00:0027 Apr 2026 15:302 days
6 Mar 2026 22:309 Mar 2026 13:152 days
6 Feb 2026 22:001 Mar 2026 18:0022 dayslong outage
16 Jan 2026 21:4526 Jan 2026 07:309 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.