Power now
410 MW
Load
49% of 830 MW
Running without a break
19 h, since yesterday 15:30
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 830 MW
now 410 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 25 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | OPL 4-05 |
|---|---|
| 18 Nov 2026 | 50% |
| 17 Nov 2026 | 52% |
| 16 Nov 2026 | 16% |
| 15 Nov 2026 | stopped |
| 14 Nov 2026 | stopped |
| 13 Nov 2026 | stopped |
| 12 Nov 2026 | stopped |
| 11 Nov 2026 | stopped |
| 10 Nov 2026 | 62% |
| 9 Nov 2026 | 57% |
| 8 Nov 2026 | 59% |
| 7 Nov 2026 | 52% |
| 6 Nov 2026 | 67% |
| 5 Nov 2026 | 57% |
| 4 Nov 2026 | 61% |
| 3 Nov 2026 | 60% |
| 2 Nov 2026 | 58% |
| 1 Nov 2026 | 50% |
| 31 Oct 2026 | 50% |
| 30 Oct 2026 | 73% |
| 29 Oct 2026 | 72% |
| 28 Oct 2026 | 72% |
| 27 Oct 2026 | 61% |
| 26 Oct 2026 | 61% |
| 25 Oct 2026 | 50% |
| 24 Oct 2026 | 58% |
| 23 Oct 2026 | 63% |
| 22 Oct 2026 | 66% |
| 21 Oct 2026 | 62% |
| 20 Oct 2026 | 66% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 10,500 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
85.2%
Outages in total
52 days
| Start | End | Length | Label |
|---|---|---|---|
| 11 Nov 2026 00:00 | 16 Nov 2026 14:30 | 5 days | |
| 22 Sep 2026 23:45 | 29 Sep 2026 02:00 | 6 days | |
| 23 May 2026 06:45 | 25 May 2026 02:30 | 1 day | |
| 29 Apr 2026 09:00 | 30 Apr 2026 18:15 | 1 day | |
| 25 Apr 2026 00:00 | 27 Apr 2026 15:30 | 2 days | |
| 6 Mar 2026 22:30 | 9 Mar 2026 13:15 | 2 days | |
| 6 Feb 2026 22:00 | 1 Mar 2026 18:00 | 22 days | long outage |
| 16 Jan 2026 21:45 | 26 Jan 2026 07:30 | 9 days | longer outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.