The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

OPL 4-06

plant: Opole · operator: PGE GiEK
Power now
410 MW
Load
49% of 840 MW
Running without a break
99 days, since 11 Aug 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 840 MW
now 410 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 12,100 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
94.5%
Outages in total
19 days
StartEndLengthLabel
13 Mar 2026 07:3016 Mar 2026 03:452 days
27 Dec 2025 01:0012 Jan 2026 14:3016 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.