The Watt Mix
live · 10:45 CET
PLEN
Pumped-storage unit

PZR 2-04

plant: Porąbka Żar · operator: PGE Energia Odnawialna
Power now
0 MW
Load
0% of 0 MW
Not running
364 days, since at least 19 Nov 2025
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 0 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
0.0%
Outages in total
364 days
StartEndLengthLabel
before 19 Nov 2025 00:00ongoing at least 364 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 3–6 days is a longer outage, 7–13 days a long one, 14 days or more a very long one. These are the thresholds for pumped-storage plants, which run intermittently.