The Watt Mix
live · 10:45 CET
PLEN
Pumped-storage power plant

Porąbka Żar

Międzybrodzie Bialskie (Silesian Voivodeship) · operator: PGE Energia Odnawialna
Power now
0 MW
Units running
0 of 4
Share of Poland's generation now
0.0%

4 units not running

Shortest stop first. A label appears from 3 days.
PZR 2-02since today 10:001 h
PZR 2-01since yesterday 19:4515 h
PZR 2-03since yesterday 19:4515 h
PZR 2-04since at least 19 Nov 2025364 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 3–6 days is a longer outage, 7–13 days a long one, 14 days or more a very long one. These are the thresholds for pumped-storage plants, which run intermittently.

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,500 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

A 500 MW pumped-storage plant with its upper reservoir on the summit of Mount Żar. It pumps water when electricity is in surplus and releases it at peak demand.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.