The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

BEL 2-03

plant: Bełchatów · operator: PGE GiEK
Power now
200 MW
Load
56% of 350 MW
Running without a break
23 days, since 25 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 350 MW
now 200 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 6,700 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
80.6%
Outages in total
55 days
StartEndLengthLabel
17 Oct 2026 00:0019 Oct 2026 03:302 days
19 Sep 2026 00:0024 Sep 2026 03:305 days
26 Jun 2026 00:0028 Jun 2026 14:452 days
13 Jun 2026 00:0015 Jun 2026 17:302 days
30 May 2026 00:151 Jun 2026 00:001 day
25 May 2026 07:4528 May 2026 02:452 days
1 May 2026 02:0023 May 2026 19:4522 dayslong outage
13 Mar 2026 00:1517 Mar 2026 00:003 days
17 Jan 2026 00:0018 Jan 2026 13:151 day
10 Jan 2026 23:0012 Jan 2026 04:001 day
2 Jan 2026 00:155 Jan 2026 02:303 days
29 Dec 2025 20:3031 Dec 2025 11:001 day
21 Dec 2025 01:1522 Dec 2025 05:001 day
14 Dec 2025 00:1516 Dec 2025 03:452 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.