Lignite power plant

Bełchatów

Rogowiec, commune of Kleszczów (Łódź Voivodeship) · operator: PGE GiEK
Power now
2,610 MW
Units running
10 of 12
Share of Poland's generation now
11.8%

10 units running

Output at 09:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
BEL 2-02
240 MW
70% of 340 MW
BEL 2-03
190 MW
54% of 350 MW
BEL 2-04
260 MW
75% of 350 MW
BEL 2-05
200 MW
54% of 380 MW
BEL 4-06
310 MW
86% of 370 MW
BEL 4-08
290 MW
79% of 360 MW
BEL 4-09
310 MW
84% of 370 MW
BEL 4-10
290 MW
79% of 360 MW
BEL 4-11
200 MW
56% of 360 MW
BEL 4-12
310 MW
84% of 370 MW

2 units not running

Shortest stop first. A label appears from 7 days.
BEL 4-07since 13 Sep 202666 daysvery long outage
BEL 4-14since 11 Jul 2026130 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 79,600 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

Europe's largest coal-fired power plant, around 5 GW. It burns lignite from the adjacent Bełchatów mine; unit 14 (858 MW) was commissioned in 2011.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.