plant: Bełchatów · operator: PGE GiEK
Power now
320 MW
Load
89% of 370 MW
Running without a break
37 days, since 11 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 370 MW
now 320 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 8,100 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
79.1%
Outages in total
71 days
StartEndLengthLabel
10 Oct 2026 00:0011 Oct 2026 13:301 day
19 Aug 2026 00:1520 Aug 2026 16:001 day
26 Jul 2026 02:158 Aug 2026 13:3013 dayslonger outage
3 Jul 2026 00:009 Jul 2026 17:156 days
4 Jun 2026 02:305 Jun 2026 04:001 day
23 May 2026 00:0024 May 2026 17:301 day
11 Apr 2026 00:1514 Apr 2026 03:003 days
4 Apr 2026 00:157 Apr 2026 18:003 days
28 Feb 2026 22:302 Mar 2026 03:151 day
14 Feb 2026 00:0017 Feb 2026 04:303 days
17 Jan 2026 00:0018 Jan 2026 21:151 day
before 19 Nov 2025 00:0020 Dec 2025 12:30at least 31 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.