Lignite unit

BEL 4-14

plant: Bełchatów · operator: PGE GiEK
Power now
0 MW
Load
0% of 560 MW
Not running
130 days, since 11 Jul 2026
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 560 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
58.4%
Outages in total
152 days
StartEndLengthLabel
11 Jul 2026 04:15ongoing 130 daysvery long outage
15 Feb 2026 16:153 Mar 2026 01:3015 dayslong outage
9 Jan 2026 00:0010 Jan 2026 13:301 day
21 Nov 2025 00:1525 Nov 2025 08:154 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.