The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

BEL 4-08

plant: Bełchatów · operator: PGE GiEK
Power now
290 MW
Load
80% of 360 MW
Running without a break
39 days, since 9 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 360 MW
now 290 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 7,700 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
67.9%
Outages in total
104 days
StartEndLengthLabel
26 Sep 2026 00:0028 Sep 2026 15:002 days
11 Jul 2026 03:1520 Sep 2026 10:1571 daysvery long outage
20 Jun 2026 00:0022 Jun 2026 15:302 days
25 Apr 2026 00:4526 Apr 2026 15:451 day
12 Apr 2026 02:0014 Apr 2026 00:451 day
5 Apr 2026 00:007 Apr 2026 03:452 days
27 Mar 2026 23:4530 Mar 2026 11:452 days
14 Mar 2026 00:0016 Mar 2026 03:302 days
11 Mar 2026 00:0012 Mar 2026 12:451 day
8 Mar 2026 07:459 Mar 2026 12:001 day
27 Feb 2026 23:452 Mar 2026 13:152 days
21 Feb 2026 21:4522 Feb 2026 23:301 day
10 Jan 2026 23:0012 Jan 2026 00:301 day
1 Jan 2026 03:455 Jan 2026 04:004 days
25 Dec 2025 00:1529 Dec 2025 05:154 days
13 Dec 2025 20:1515 Dec 2025 00:001 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.