The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

BEL 2-04

plant: Bełchatów · operator: PGE GiEK
Power now
220 MW
Load
62% of 350 MW
Running without a break
2 days, since 15 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 350 MW
now 220 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 8,100 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
80.3%
Outages in total
58 days
StartEndLengthLabel
29 Sep 2026 00:001 Oct 2026 22:452 days
25 Jul 2026 08:3027 Jul 2026 18:152 days
8 Jul 2026 00:459 Jul 2026 15:151 day
13 Jun 2026 01:0015 Jun 2026 16:002 days
6 Jun 2026 00:008 Jun 2026 14:452 days
1 May 2026 22:154 May 2026 13:302 days
22 Apr 2026 14:0028 Apr 2026 18:156 days
11 Apr 2026 05:0013 Apr 2026 14:302 days
4 Apr 2026 21:157 Apr 2026 13:152 days
12 Mar 2026 23:3029 Mar 2026 09:0016 dayslong outage
10 Jan 2026 23:1512 Jan 2026 01:001 day
1 Jan 2026 00:155 Jan 2026 08:004 days
23 Dec 2025 23:4529 Dec 2025 06:005 days
13 Dec 2025 00:3016 Dec 2025 05:003 days
7 Dec 2025 00:008 Dec 2025 16:001 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.