The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

BEL 4-10

plant: Bełchatów · operator: PGE GiEK
Power now
310 MW
Load
84% of 360 MW
Running without a break
2 days, since 15 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 360 MW
now 310 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 29 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 8,000 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
86.9%
Outages in total
40 days
StartEndLengthLabel
14 Nov 2026 00:0015 Nov 2026 15:151 day
28 Jun 2026 00:0029 Jun 2026 03:451 day
12 Jun 2026 10:0016 Jun 2026 16:154 days
6 Jun 2026 01:157 Jun 2026 17:001 day
28 May 2026 09:1531 May 2026 22:003 days
1 May 2026 00:003 May 2026 22:452 days
28 Apr 2026 09:4529 Apr 2026 16:301 day
11 Apr 2026 00:1526 Apr 2026 10:0015 dayslong outage
29 Mar 2026 00:0030 Mar 2026 04:001 day
12 Mar 2026 23:0015 Mar 2026 15:152 days
8 Mar 2026 00:009 Mar 2026 15:151 day
21 Feb 2026 22:4524 Feb 2026 04:302 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.