The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

TUR 1-01

plant: Turów · operator: PGE GiEK
Power now
0 MW
Load
0% of 230 MW
Not running
4 days, since 14 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 230 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 25 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
88.2%
Outages in total
42 days
StartEndLengthLabel
14 Nov 2026 00:15ongoing 4 days
6 Jun 2026 08:3023 Jun 2026 17:1517 dayslong outage
10 Apr 2026 01:1520 Apr 2026 09:3010 dayslonger outage
21 Jan 2026 21:1531 Jan 2026 08:309 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.