Power now
100 MW
Load
44% of 230 MW
Running without a break
46 days, since 3 Oct 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 230 MW
now 100 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 30 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | TUR 2-03 |
|---|---|
| 18 Nov 2026 | 49% |
| 17 Nov 2026 | 61% |
| 16 Nov 2026 | 57% |
| 15 Nov 2026 | 59% |
| 14 Nov 2026 | 59% |
| 13 Nov 2026 | 56% |
| 12 Nov 2026 | 78% |
| 11 Nov 2026 | 86% |
| 10 Nov 2026 | 86% |
| 9 Nov 2026 | 72% |
| 8 Nov 2026 | 63% |
| 7 Nov 2026 | 63% |
| 6 Nov 2026 | 61% |
| 5 Nov 2026 | 61% |
| 4 Nov 2026 | 68% |
| 3 Nov 2026 | 69% |
| 2 Nov 2026 | 66% |
| 1 Nov 2026 | 54% |
| 31 Oct 2026 | 66% |
| 30 Oct 2026 | 68% |
| 29 Oct 2026 | 66% |
| 28 Oct 2026 | 79% |
| 27 Oct 2026 | 61% |
| 26 Oct 2026 | 54% |
| 25 Oct 2026 | 44% |
| 24 Oct 2026 | 53% |
| 23 Oct 2026 | 77% |
| 22 Oct 2026 | 76% |
| 21 Oct 2026 | 65% |
| 20 Oct 2026 | 70% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,400 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
52.9%
Outages in total
167 days
| Start | End | Length | Label |
|---|---|---|---|
| 8 Sep 2026 02:15 | 3 Oct 2026 11:15 | 25 days | long outage |
| 26 Jul 2026 05:15 | 7 Aug 2026 13:45 | 12 days | longer outage |
| 3 Jul 2026 01:00 | 13 Jul 2026 20:45 | 10 days | longer outage |
| 26 Mar 2026 00:15 | 7 Jun 2026 18:30 | 73 days | very long outage |
| 12 Feb 2026 10:45 | 24 Feb 2026 15:15 | 12 days | longer outage |
| 1 Feb 2026 00:00 | 10 Feb 2026 07:30 | 9 days | longer outage |
| 10 Jan 2026 23:30 | 12 Jan 2026 04:45 | 1 day | |
| 24 Nov 2025 10:15 | 16 Dec 2025 02:45 | 21 days | long outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.