Lignite unit

TUR 2-03

plant: Turów · operator: PGE GiEK
Power now
100 MW
Load
44% of 230 MW
Running without a break
46 days, since 3 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 230 MW
now 100 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,400 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
52.9%
Outages in total
167 days
StartEndLengthLabel
8 Sep 2026 02:153 Oct 2026 11:1525 dayslong outage
26 Jul 2026 05:157 Aug 2026 13:4512 dayslonger outage
3 Jul 2026 01:0013 Jul 2026 20:4510 dayslonger outage
26 Mar 2026 00:157 Jun 2026 18:3073 daysvery long outage
12 Feb 2026 10:4524 Feb 2026 15:1512 dayslonger outage
1 Feb 2026 00:0010 Feb 2026 07:309 dayslonger outage
10 Jan 2026 23:3012 Jan 2026 04:451 day
24 Nov 2025 10:1516 Dec 2025 02:4521 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.