The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

TUR 4-11

plant: Turów · operator: PGE GiEK
Power now
380 MW
Load
85% of 450 MW
Running without a break
6 days, since 12 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 450 MW
now 380 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 25 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 9,400 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
70.3%
Outages in total
107 days
StartEndLengthLabel
8 Nov 2026 00:0012 Nov 2026 09:304 days
24 Oct 2026 10:1526 Oct 2026 04:151 day
2 Oct 2026 00:1515 Oct 2026 04:4513 dayslonger outage
28 Aug 2026 03:302 Sep 2026 15:455 days
22 Jul 2026 18:4526 Jul 2026 20:004 days
30 Jun 2026 02:152 Jul 2026 05:152 days
27 May 2026 00:007 Jun 2026 18:3011 dayslonger outage
7 May 2026 00:1510 May 2026 16:153 days
1 May 2026 00:004 May 2026 11:153 days
2 Apr 2026 06:459 Apr 2026 15:007 dayslonger outage
25 Mar 2026 00:0026 Mar 2026 06:151 day
21 Mar 2026 00:3023 Mar 2026 04:452 days
2 Mar 2026 08:009 Mar 2026 03:456 days
21 Jan 2026 06:3025 Jan 2026 12:304 days
21 Dec 2025 00:005 Jan 2026 11:1515 dayslong outage
before 19 Nov 2025 00:008 Dec 2025 14:00at least 19 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.