Lignite power plant

Turów

Bogatynia (Lower Silesian Voivodeship) · operator: PGE GiEK
Power now
970 MW
Units running
6 of 7
Share of Poland's generation now
4.4%

6 units running

Output at 09:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
TUR 2-02
100 MW
44% of 230 MW
TUR 2-03
120 MW
50% of 230 MW
TUR 2-04
90 MW
38% of 240 MW
TUR 2-05
160 MW
65% of 250 MW
TUR 2-06
170 MW
71% of 240 MW
TUR 4-11
340 MW
76% of 450 MW

1 unit not running

Shortest stop first. A label appears from 7 days.
TUR 1-01since 14 Nov 20264 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 27,000 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

A power plant next to the Turów mine, where the borders with Czechia and Germany meet. The newest unit, no. 11 (around 460 MW), was commissioned in 2021.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.