The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

TUR 2-06

plant: Turów · operator: PGE GiEK
Power now
190 MW
Load
78% of 240 MW
Running without a break
14 days, since 4 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 240 MW
now 190 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 15 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,200 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
75.3%
Outages in total
89 days
StartEndLengthLabel
1 Nov 2026 05:154 Nov 2026 05:153 days
19 Oct 2026 06:151 Nov 2026 03:3012 dayslonger outage
27 Jun 2026 00:0015 Jul 2026 04:1518 dayslong outage
4 Jun 2026 06:305 Jun 2026 15:001 day
17 May 2026 00:1521 May 2026 20:454 days
4 May 2026 23:006 May 2026 04:301 day
25 Apr 2026 00:004 May 2026 22:309 dayslonger outage
10 Feb 2026 19:3016 Feb 2026 06:005 days
17 Jan 2026 00:006 Feb 2026 10:1520 dayslong outage
6 Jan 2026 00:1510 Jan 2026 13:154 days
6 Dec 2025 00:1513 Dec 2025 08:157 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.