The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

TUR 2-02

plant: Turów · operator: PGE GiEK
Power now
90 MW
Load
39% of 230 MW
Running without a break
23 days, since 25 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 230 MW
now 90 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,400 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
53.6%
Outages in total
166 days
StartEndLengthLabel
18 Sep 2026 00:3025 Sep 2026 19:457 dayslonger outage
6 Sep 2026 23:3017 Sep 2026 15:4510 dayslonger outage
5 Sep 2026 00:156 Sep 2026 17:451 day
11 Aug 2026 00:4531 Aug 2026 06:0020 dayslong outage
4 Jul 2026 08:307 Jul 2026 04:452 days
13 Jun 2026 01:001 Jul 2026 16:1518 dayslong outage
13 May 2026 00:1519 May 2026 11:156 days
17 Apr 2026 00:307 May 2026 20:1520 dayslong outage
7 Mar 2026 00:159 Apr 2026 21:0033 daysvery long outage
10 Dec 2025 12:3019 Jan 2026 11:4539 daysvery long outage
29 Nov 2025 21:153 Dec 2025 06:303 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.