Power now
130 MW
Load
53% of 250 MW
Running without a break
2 days, since 15 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 250 MW
now 130 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 30 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | TUR 2-05 |
|---|---|
| 18 Nov 2026 | 57% |
| 17 Nov 2026 | 71% |
| 16 Nov 2026 | 68% |
| 15 Nov 2026 | 6% |
| 14 Nov 2026 | 68% |
| 13 Nov 2026 | 64% |
| 12 Nov 2026 | 84% |
| 11 Nov 2026 | 95% |
| 10 Nov 2026 | 95% |
| 9 Nov 2026 | 75% |
| 8 Nov 2026 | 60% |
| 7 Nov 2026 | 39% |
| 6 Nov 2026 | 62% |
| 5 Nov 2026 | 62% |
| 4 Nov 2026 | 78% |
| 3 Nov 2026 | 79% |
| 2 Nov 2026 | 68% |
| 1 Nov 2026 | 63% |
| 31 Oct 2026 | 68% |
| 30 Oct 2026 | 79% |
| 29 Oct 2026 | 72% |
| 28 Oct 2026 | 94% |
| 27 Oct 2026 | 67% |
| 26 Oct 2026 | 63% |
| 25 Oct 2026 | 48% |
| 24 Oct 2026 | 53% |
| 23 Oct 2026 | 87% |
| 22 Oct 2026 | 93% |
| 21 Oct 2026 | 93% |
| 20 Oct 2026 | 96% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,200 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
65.7%
Outages in total
119 days
| Start | End | Length | Label |
|---|---|---|---|
| 22 Aug 2026 14:30 | 27 Aug 2026 15:30 | 5 days | |
| 15 Aug 2026 04:00 | 19 Aug 2026 20:00 | 4 days | |
| 9 Aug 2026 00:45 | 10 Aug 2026 02:15 | 1 day | |
| 8 Jul 2026 18:00 | 29 Jul 2026 01:00 | 20 days | long outage |
| 6 Jul 2026 11:45 | 8 Jul 2026 16:30 | 2 days | |
| 4 Jul 2026 00:30 | 5 Jul 2026 22:45 | 1 day | |
| 24 May 2026 11:00 | 29 May 2026 16:45 | 5 days | |
| 17 May 2026 19:15 | 23 May 2026 19:00 | 5 days | |
| 12 May 2026 08:30 | 17 May 2026 17:45 | 5 days | |
| 1 May 2026 07:30 | 3 May 2026 17:00 | 2 days | |
| 25 Apr 2026 08:15 | 27 Apr 2026 10:45 | 2 days | |
| 5 Apr 2026 07:45 | 7 Apr 2026 05:45 | 1 day | |
| 27 Feb 2026 13:00 | 16 Mar 2026 10:30 | 16 days | long outage |
| 29 Dec 2025 13:45 | 26 Jan 2026 05:30 | 27 days | long outage |
| 10 Dec 2025 14:45 | 12 Dec 2025 05:00 | 1 day | |
| before 19 Nov 2025 00:00 | 3 Dec 2025 07:15 | at least 14 days | long outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.