The Watt Mix
live · 10:45 CET
PLEN
Lignite unit

TUR 2-05

plant: Turów · operator: PGE GiEK
Power now
130 MW
Load
53% of 250 MW
Running without a break
2 days, since 15 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 250 MW
now 130 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,200 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
65.7%
Outages in total
119 days
StartEndLengthLabel
22 Aug 2026 14:3027 Aug 2026 15:305 days
15 Aug 2026 04:0019 Aug 2026 20:004 days
9 Aug 2026 00:4510 Aug 2026 02:151 day
8 Jul 2026 18:0029 Jul 2026 01:0020 dayslong outage
6 Jul 2026 11:458 Jul 2026 16:302 days
4 Jul 2026 00:305 Jul 2026 22:451 day
24 May 2026 11:0029 May 2026 16:455 days
17 May 2026 19:1523 May 2026 19:005 days
12 May 2026 08:3017 May 2026 17:455 days
1 May 2026 07:303 May 2026 17:002 days
25 Apr 2026 08:1527 Apr 2026 10:452 days
5 Apr 2026 07:457 Apr 2026 05:451 day
27 Feb 2026 13:0016 Mar 2026 10:3016 dayslong outage
29 Dec 2025 13:4526 Jan 2026 05:3027 dayslong outage
10 Dec 2025 14:4512 Dec 2025 05:001 day
before 19 Nov 2025 00:003 Dec 2025 07:15at least 14 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.